Automation of 3D models and 2D drawings of Helical Baffles
Inputs: 60 parameters
Outputs:
- Automatic generation of 3D Model
- Automatic generation of BOM, Tables and Drafting Sheet
Savings
Time taken before implementation:
-
- 1 man-month
Time taken after implementation:
-
- 2 – 3 man-days
Successfully Implemented in over many live jobs to date
Automation of 3D models and 2D drawings of Tubebundle Assembly
• Benefits:
– Inputs: Just 75 design parameters
– Outputs
- Automatic creation of 3D models
- Automatic creation of manufacturing drawings (2 nos.)
- Automatic creation of BOM
• Time taken before KBE: 1 – 2 man-months
• Time taken after implementation: 1 – 2 man-days
• Successfully Implemented in over many live jobs to date